
Our Projects
636 Southchurch Road
Southend SS1
Burke Demolition was appointed as principle contractor to demolish the former two storey building in the heart of the busy seaside town of Southend.
Works Consisted of:
• Erection of Hoarding
• Asbestos Removal
• Total Demolition
• Crushing of All hard Material to 6F2 Specification








Quest House
Hounslow, London
Burke Demolition was appointed as principle contractor to carry out the soft strip and structural alterations of the 5 storey office block.
Works Consisted of:
-
Full Refurbishment and Demolition Survey
-
Total Strip out Back to Base Build
-
Removal of Roof Top Plant Room
-
Demolition of Existing Concrete Staircase
-
Formation Of 8meter x 8meter structural opening through each floor for new stair case structure.
Former Cummins Distribution Centre
Ramsgate
Burke Demolition were appointed to by a specialist main contractor to carry out the internal strip out and full M+E Removal of the 185,000 SQFT warehouse.
Works Consisted of:
• Full Internal Strip out of 3 Storey office area
• Total Removal of all M+E within the warehouse area








54 Clapton Common
Burke Demolition Ltd was awarded the contract to demolish the existing 1930’s structure and clear all materials generated within the demolition process from the site.
Following the demolition and clearance, Burke Demolition were instructed to remove Japanese Knotweed and remove all contaminated waste from the site working alongside our environmental consultants Ebsford Environmental Ltd.
On completion of the works a full warranty document was issued to the client.
Ironbridge House
Hanwell London
Burke Demolition Ltd undertook the soft strip, façade retention and demolition to the former Noon Laboratories Hanwell.
The works consisted of soft strip, asbestos removal, design and installation of temporary works, full demolition behind retained façade, structural alterations to a four-storey former transformer station, removal of oversite slab and foundations around 66,000-volt oil-filled cables.
All works were carried out to a 12-week program on time on budget and to the client's total satisfaction.










Former BHS Store
Maidstone
Burke Demolition Ltd undertook the asbestos removal, soft strip and partial demolition including removal of all escalators and M+E throughout the 62,000SqFt BHS Store over 5 floors.
Over a 14 week program our site team carried out works to meet the noise restrictions set out by the live shopping centre, all materials were removed from the site via the lift shaft into a live service area.

Recently Awarded Projects
